Sl. No. | Name of Dam / Reservoir | District | MWL (metre) | FRL (metre) | Spillway Crest Level (metre) | Live Storage at FRL (MCM) | Rule level (metre) | Blue level (metre) | Orange level (metre) | Red Level (metre) | Today’s Water level (metre) | Today’s Live Storage (MCM) | % Storage wrt Live Storage at FRL | Same day previous year Water level (metre) | Same day previous year Live Storage (MCM) | Inflow (cumecs) | Power House Discharge(cumecs) | Spillway release (cumecs) | Total Outflow (cumecs) | Rain fall (mm) | Remarks |
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20=18+19 | 21 | 22 |
1 | IDUKKI | IDK | 2408.5 ft | 2403 ft | 2373 ft | 1459.49 | 2383.53 ft | 2375.53 | 2381.53 | 2382.53 | 2332.94ft | 471.088 | 32.28% | 2387.40ft | 1198.674 | 26.81 | 50.07 | 0.00 | 50.07 | 0.00 | |
2 | IDAMALAYAR | EKM | 171.00 | 169.00 | 161.00 | 1017.80 | 163.00 | 161.50 | 162.00 | 162.50 | 146.02 | 428.420 | 42.09% | 164.81 | 896.828 | 25.75 | 34.84 | 0.00 | 34.84 | 0.00 | |
3 | KAKKI (ANATHODE ) | PTTA | 982.160 | 981.460 | 975.360 | 446.51 | 975.75 | 973.75 | 974.75 | 975.25 | 958.15 | 167.100 | 37.42% | 976.72 | 368.140 | 11.70 | 30.22 | 0.00 | 30.22 | 8.00 | |
4 | BANASURASAGAR (K A SCHEME) | WND | 775.600 | 775.600 | 767.000 | 201.00 | 774.00 | 772.50 | 773.00 | 773.50 | 768.60 | 119.950 | 59.68% | 774.55 | 188.150 | 13.89 | 0.00 | 0.00 | 0.00 | 0.00 | Tunnel Outflow – 0.0 MCM |
5 | SHOLAYAR | TSR | 2663 ft | 2663 ft | 2642 ft | 149.09 | 2658.00 | 2659.50 | 2661.00 | 2637.20ft | 87.449 | 58.66% | 2658.80 | 137.371 | 17.55 | 6.10 | 0.00 | 6.10 | 0.00 | ||
6 | MADUPETTY | IDK | 1599.59 | 1599.59 | 1594.71 | 54.77 | 1596.00 | 1597.00 | 1598.00 | 1588.15 | 27.640 | 50.47% | 1598.55 | 51.590 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | Sluice discharge/day – 0.00 McM | |
7 | ANAYIRANKAL | IDK | 1210.070 | 1207.020 | 1207.020 | 49.83 | 1205.02 | 1206.02 | 1207.02 | 1196.73 | 13.0353 | 26.16% | 1204.30 | 37.922 | 0.20 | 0.00 | 0.00 | 0.00 | 0.00 | Sluice discharge/day – 0 McM | |
8 | PONMUDI | IDK | 708.660 | 707.750 | 701.350 | 47.40 | 704.50 | 705.50 | 706.50 | 698.55 | 27.7925 | 58.63% | 706.65 | 44.360 | 8.83 | 15.30 | 0.00 | 15.30 | 0.00 | ||
9 | KUTTIYADI (KAKKAYAM) | KKD | 758.040 | 758.040 | 751.640 | 33.98 | 755.50 | 756.50 | 757.50 | 749.99 | 15.770 | 46.41% | 757.52 | 32.68 | 7.53 | 19.54 | 0.00 | 19.54 | 21.00 | ||
10 | PAMBA | PTTA | 986.330 | 986.330 | 981.460 | 31.15 | 982.00 | 983.50 | 984.50 | 964.10 | 0.69 | 2.22% | 984.75 | 27.87 | 5.66 | 0.00 | 0.00 | 0.00 | 0.00 | ||
11 | PORINGALKUTHU | TSR | 423.980 | 423.980 | 419.410 | 30.30 | 421.00 | 422.00 | 423.00 | 421.25 | 22.88 | 75.51% | 419.80 | 19.250 | 8.30 | 14.09 | 0.00 | 14.09 | 0.00 | ||
12 | KUNDALA | IDK | 1759.30 | 1758.690 | 7.65 | 1755.00 | 1756.00 | 1757.00 | 1754.30 | 4.650 | 60.78% | 1758.35 | 7.160 | 0.58 | 0.00 | 0.00 | 0.00 | 9.00 | Sluice discharge/day – 0 McM | ||
13 | KALLARKUTTY | IDK | 456.900 | 456.590 | 450.200 | 6.43 | 455.00 | 451.70 | 3.556 | 55.30% | 456.00 | 6.092 | 18.03 | 19.80 | 0.00 | 19.80 | 0.00 | ||||
14 | ERATTAYAR | IDK | 754.380 | 754.380 | 748.280 | 5.29 | 748.28 | 746.90 | 0.8977 | 16.96% | 749.40 | 0.00 | |||||||||
15 | LOWER PERIYAR | IDK | 256.00 | 253.00 | 237.74 | 4.55 | 252.00 | 250.00 | 3.290 | 72.31% | 252.80 | 4.464 | 34.36 | 33.01 | 0.00 | 33.01 | 0.00 | ||||
16 | MOOZHIYAR | PTTA | 192.940 | 192.630 | 186.530 | 1.16 | 190.00 | 188.10 | 0.580 | 50.00% | 187.45 | 0.513 | 26.67 | 23.89 | 0.00 | 23.89 | 0.00 | ||||
17 | KALLAR | IDK | 824.480 | 824.480 | 818.380 | 0.76 | 823.50 | 820.20 | 0.1917 | 25.12% | 821.00 | 0.00 | |||||||||
18 | SENGULAM (PUMPING STORAGE DAM) | IDK | 849.49 | 847.640 | 847.64 | 0.39 | 846.50 | 0.118 | 30.26% | 846.65 | 0.154 | 5.31 | 5.58 | 0.00 | 5.58 | 0.00 |